Heavy Engineering, Offshore: Turning a Jack-Up Into Its Own Workshop


A client required the urgent reactivation and repair of a jacking systemon their offshore jack-up rig. Several gearboxes needed to be overhauled to restore jacking capability, but the static loading conditions meant that only two gearboxes could be removed at a time, and each had to be reinstalled before the next could be serviced.

Under normal circumstances, such precision heavy-engineering workrequires gearboxes to be transported onshore to a specialized workshop—an approach that would have added significant time and risk to the client’s schedule.

Recognizing the urgency, Hayat Lestari Holdings mobilized a team of specialistswho designed and fabricated custom toolsto establish a temporary onboard workshop. This innovative solution enabled the full overhaul of the gearboxes offshore, without the need for onshore facilities.

By executing the work directly on the rig, we completed the project in one-third of the usual time, allowing the client to meet their operational schedule and avoid costly delays.

This project demonstrates our ability to combine engineering precision with field adaptability, delivering fast-track solutions that keep our clients’ assets operational even under the most demanding conditions.



DJI_20250421090846_0271_D
DJI_20250421100349_0321_D
DJI_20250502084834_0808_D
DJI_20250418075559_0143_D
DJI_20250418104723_0347_D
DJI_20250419084115_0569_D - Copy
DJI_20250422111042_0406_D
DJI_20250422112309_0416_D
DJI_20250422113644_0424_D
DJI_20250501094551_0656_D
DJI_20250501094813_0662_D